Piling


Setting-out for major piling & geotechnical firms. Pile positions are marked out to tight tolerances, pinned & capped. As-Built surveys are carried out on completed piles to check the deviation between the designed & actual positions. The results are entered into our spreadsheet & any piles over 75mm out of position are flagged.

As-Built-SurveyLarge

Pile coordinates can be input manually into our robotic total stations or the AutoCad dxf files can be downloaded from our software and marked out as the job progresses.

Pile-layoutLarge

We have worked on many contracts from individual house plots to large industrial units and schools for many companies including Roger Bullivant, Keller Ground Engineering, Bachy Soletanche, & Balfour Beatty Ground Engineering.

Past projects include Thomas Telford School, Chelsea, Westminster Hospital & Catterick Barracks.

 

 